Gokul Gopan Contact
← Back to Projects
Inner-city parking facilities and capacities in Amberg

Parking & Cycling Accessibility for the City of Amberg

Parking AccessibilityCyclingGOATBavaria

Overview

Two accessibility reports for the City of Amberg and its historic city centre, built with GOAT. The first report examined how accessible various destinations in Amberg's city centre are from the available parking facilities. The second analysed and compared different variants of a planned new cycle path connection, "Höchste Eisenbahn."

The parking report answered four questions: how well public parking garages and on-street parking are served by car; how well the Marktplatz is served by bicycle; how walkable various points of interest are from parking facilities; and where gaps remain in the parking offer. The cycle path report modelled the accessibility gain of the new connection for residents and key destinations, comparing a variant without an underpass against one with an underpass.

I carried out the accessibility analyses — on foot, by bicycle and by car — and produced the cartography for both reports.

Client: City of Amberg · Period: 2023–2024

View on Plan4Better ↗

Workflow

Follow the process. Expand a step for the details.

  1. 01Parking InventoryDetails +

    Mapped all inner-city parking garages, parking areas and on-street parking in Amberg's historic centre, including capacity per facility.

  2. 02Multimodal Accessibility AnalysisDetails +

    Analysed walking accessibility from parking facilities to key points of interest, cycling accessibility to the Marktplatz, and car accessibility to the Altstadtgarage from the wider region.

  3. 03Gap IdentificationDetails +

    Identified gaps in the parking offer relative to demand and destination coverage across the city centre.

  4. 04Cycle Path Variant ComparisonDetails +

    Modelled the planned "Höchste Eisenbahn" cycle path and compared the accessibility gain for residents and POIs between a variant without an underpass and one with an underpass.

Walking Accessibility

Walking accessibility from the inner-city parking facilities to public buildings and points of interest, shown in 3/5/7/10-minute catchments.

Walking accessibility to public facilities from parking locations in Amberg

Car Accessibility

Motorised private transport (MIV) catchments to the Altstadtgarage from the wider Amberg region, at 5/10/15/20-minute thresholds.

Car accessibility of the Altstadtgarage car park from the Amberg region

Cycle Path Analysis

For the planned "Höchste Eisenbahn" cycle path, the report compared the accessibility gain over the current situation for two variants: without an underpass, and with an underpass — quantifying how much better residents and key destinations would be served by each option.

Tools & Technologies

  • GOAT (Plan4Better) — multimodal accessibility analysis and cartographic output
  • Walking, cycling and car (MIV) catchment analysis
  • Inner-city parking inventory and capacity data
  • Scenario comparison for planned cycling infrastructure

Outcome

Delivered two accessibility reports that give the City of Amberg an evidence base for parking and cycling decisions in its historic centre — pinpointing gaps in the current parking offer and quantifying the accessibility benefit of a new cycle path connection under two design variants.